FNX Floor Notching Machine2024-09-04T11:59:31-06:00

FNX

Floor Notching Machine

pillar fnx floor notching machine

FNX Advantages:

  • one
  • two
  • three

Category: Custom Machines

Great for cabinet box/case makers who need speed when producing notched products.

machines made to order
pillar machine standard features, freight options

Freight Included

pillar machine standard features, freight options

FREE Online Training

pillar machine standard features, freight options

1 Year Warranty

pillar machine standard features, freight options

Made in the USA

pillar fnx notched part sample
pillar fnx floor notching machine

FNX Machine Description

The FNX is designed to notch floor corners with a ¼” X 1″ notch each side.

Standard Operation

The machine will have two notching stations allowing you to notch both corners of the cabinet floors at one time.

Machine’s width will be manually adjusted and locked into place by placing an unnotched part into the machine and manually moving both notching heads in until they cannot move any closer together due to the width of the unnotched part. This will allow you to notch both corners at one time on up to 2.5″ thick amount of parts.

pillar fnx notched parts in stack

The FNX performs the following operations:

1. Notch Cabinet Floor Corners, 2 at a time.

pillar electric cabinet

Pillar Electric Cabinet

pillar plc

FNX PLC

The Pillar FNX machine uses a PLC control for simple and easy to use controls. PLC is an acronym for Programmable Logic Controller: an industrial microprocessor-based controller with programmable memory used to store program instructions and various functions.

Manual Controls

The FNX has simple manual controls.

Start, stop and pressure controls.

pillar machine fnx controls

What Comes with the FNX

pillar machine and larick sanders

Pillar FNX Custom Tooling

pillar machine and larick sanders

2 Notching Stations

pillar machine

Pillar Machine 3D Model

installation and training

Installation & Training

One day of installation is included in price of machinery.

Customer Responsibilities:
1. Floor preparation per your needs.
2. All power supply connection per national and local codes and standards.
3. Any necessary pneumatic connections and supply.
4. Moving of the equipment which could require forklift(s), rigging, and labor.
5. Materials and tooling needed for machine testing, training, or adjusting.

Expectations

The machine will ship fully assembled, and nearly functional. Pillar Machine expects the machinery to be in place, and all the necessary utilities to have already been brought to the machine before the technician arrives. The technician will finish preparing the machine to run and instruct any machine operators in how to maintain and operate the machine properly.

Should the machine not be ready at the time of the technician’s arrival, Pillar Machine reserves the right to charge up to $1000 for itinerary changes in the case of a complete cancellation of the installation, Pillar Machine will charge the full $1600 per day rate plus all travel expenses for the return visit.

Training

Training should be attended by all individuals that need to understand how the machine functions including all Management personnel, Team Leaders, Operators and Maintenance personnel. If this machine is going in operation for multiple shifts per day, we suggest having all personal from those shifts attend this training session as well. If this is not possible and they need to be trained from the factory technician, please ask your Pillar Machine sales representative to add an additional day of training.

Details

Notes: One day of technician time is defined no less than 6 hours on-site. The technician will spend the first few hours getting the machine setup correctly and the remaining time training.

If you have purchased a custom machine that has custom tooling you have purchased, make sure to have the tooling onsite and ready for installation, prior to the installer arriving. If we purchased the tooling, it will be on your machine. Have your samples ready for the installer.

The technician has planned the day(s) to install the machine and do any training of the machine as indicated in the contract. Having your appropriate tools and equipment needed to do the install and training will provide you and the technician a smooth install.

pillar machines are made in the usa

Made In The USA

All Pillar Machine Machines are built 100% at our Salt Lake City Factory.

The benefits of purchasing an American made machine extend far beyond simply supporting the “local” economy.

Additional benefits include:

  • All parts are sourced from vendors in North America.
  • Parts availability is increased and assures honest pricing.
  • Real Factory Support.
    When technical assistance is required you can often talk directly to the people that built, wired, and tested your machine.
pillar machines are made in the usa

1 Year Warranty

Pillar Machine warrants to the original purchaser of the Pillar Machine Machinery that this product will be free from defects in material or workmanship, when purchased, and under proper, normal use, for one (1) year from the original date of delivery. Original purchaser understands that the machine warranty is only applicable to machines that are or were paid in full within 60 days of the original delivery date.

The full defined warranty can be found here: https://pillarmachine.com/pillar-service/#warranty 

machine run off

Machine Run-Off

A full run-off at our facility in Salt Lake City is required prior toshipment of this machine. The purpose of the run-off is to ensure that all specifications are meet with satisfaction.

Pre-Run Off Requirements:

Please send adequate sample material to us 1 month prior to machine run off. This helps us provide a more realistic production run during the run-off.

Run Off Requirements:

  1. A qualified representative of the customer must attend the runoff to ensure that the machine is configured and performs to specifications.
  2. If changes to the machine are requested at time of run-off, a change order document will be created outlining the specifics of the change.
    2a. If delivery date of machine is affected as result of the change request Pillar Machine will renegotiate the final payment terms.
  3. If extensive changes are made that effect the overall performance of the machine, a second run off is required at our facility. Alternately, a virtual runoff can be done on this project if both parties agree that is sufficient to show the machines capabilities.

Options for the FNX

Go to Top